Created 17-Apr-17
36 photos
Easter Monday was overcast with a threat of rain that never materialised. The GCR Easter Festival timetable involved intensive running with three locomotives providing a 45 minute interval service from both ends of the line. Fortunately, with only south facing tender locomotives involved, there was no need to switch direction.
Category:
Subcategory:
Subcategory Detail:
Keywords: