Created 3-Sep-24
52 photos

It has been a long time that 60163 TORNADO has been nearly ready to begin running-in trials at the GCR. We were promised also the locomotive would operate some passenger services when it was proved safe for it to do so. These runs took place first over the weekend bridging August and September 2024. The newly overhauled locomotive looked superb, performed perfectly and treated all that attended to a great day out whatever our interest. The timetable, that involved all trains running the entire length of the line, proved to be robust also.
XH31 01DC_Canon6D_EF85mmXH31 02DC_Canon6D_EF85mmXH31 03DC_NikonDf_AF-NikkorD50mmXH31 04DC_Canon6D_EF85mmXH31 05DC_Canon6D_EF85mmXH31 06DC_Canon6D_EF85mmXH31 07DC_Canon6D_EF85mmXH31 08DC_Canon6D_EF85mmXH31 09DC_NikonDf_AF-NikkorD50mmXH31 10DC_NikonDf_AF-NikkorD50mmXH31 11DC_NikonDf_AF-SNikkor28-300G@100mmXH31 12DC_NikonDf_AF-SNikkor28-300G@100mmXH31 13DC_NikonDf_AF-SNikkor28-300G@100mmXH31 14DC_Canon6D_EF85mmXH31 15DC_Canon6D_EF85mmXH31 16DC_Canon6D_EF85mmXH31 17DC_Canon6D_EF85mmXH31 18DC_NikonDf_AF-SNikkor28-300G@145mmXH31 19DC_NikonDf_AF-SNikkor28-300G@150mmXH31 20DC_Canon6D_EF70-300L@70mm

Categories & Keywords
Category:
Subcategory:
Subcategory Detail:
Keywords: