Created 28-Jun-19
30 photos
In many ways Sunday 23rd June 2019 was more successful than the previous day. Most trains ran close to schedule and I saw no evidence of lineside fires. 8F 48624 was replaced by 3F 47406 which required more frequent visits to the water crane with unavoidable time loss but this seemed to have been well managed.
Category:
Subcategory:
Subcategory Detail:
Keywords: