Thank you for your patience while we retrieve your images.
Taken 9-Jul-21
Visitors 1


17 of 62 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions960 x 960
Original file size2.66 MB
Image typeTIFF
Color spacesRGB
Date taken9-Jul-21 17:08
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON Df
FlashNot fired
Exposure prog.Shutter priority
ISO speedISO 2500
Metering modeCenter-weighted average
UG09 17DC_NikonDf_AF-SNikkor28-300G@170mm

UG09 17DC_NikonDf_AF-SNikkor28-300G@170mm

Fortunately, in some respects, the departure of RTC's "End of Southern Steam" rail-tour was delayed by about 15 minutes. This gave the track time to recover from a short but heavy rain shower. M.N. Class 8P 4-6-2 35018 BRITISH INDIA LINE was working hard but not fully stretched to the limit as it hauled the train up the 1 in 50 towards the Bincombe Tunnels on 9th July 2021.